The first chapter is the outline of the project
    The increasing demand for enterprise / government / finance business for IT data centers, so data centers need to provide more quickly needed computing, network, storage resources. If you keep buying new servers, it will increase purchasing costs and operating costs, but also bring more business, power supply and room cooling costs. At the same time, in general, the enterprise server workload is generally no more than 10%, which led to a large number of hardware, cabinet space and waste of electricity. The purchase of new servers within the enterprise / organization is a long process, which makes the IT department more difficult to meet the needs of business growth and change. For example, with the increase of new business system platforms, the need for offline and offline testing platforms often consumes a great deal of valuable resources and time.
In order to solve the problems brought by the increase of the number of servers, improve the server resource usage, reduce equipment procurement costs, improve business continuity and for the future of the new application system construction provides a flexible platform for the use of resources, integration of existing server virtualization.
XXX customers as domestic large enterprises / government units, the construction of information technology continues to develop. At present, the information network for the Information Center for operation and maintenance units, covering such as OA, Mail, ERP, middleware services, government platforms and other business systems, server resources large. For the sake of economic efficiency and management security, virtualization integration for infrastructure is imperative.
The second chapter, demand analysis
2.1 analysis of the status quo
XXX customer data center is mainly based on X86 server, running OA, Mail, ERP, middleware services, government platform and other business systems. The specific server configuration is shown below, which covers the server configuration of the major business systems.
 
System
Model
To configure
Video Server
PowerEdge 2950
Xeon E5410 *2/4GB
Download Server
PowerEdge 2950
Xeon E5110 *2/2GB
Production and Operation Management System
PowerEdge 2950
Xeon E5410 *2/4GB
Fixed Assets Management System
PowerEdge 2950
Xeon E5410 *2/4GB
Mobile Station Service Management System
PowerEdge 2950
Xeon E5410 *2/2GB
NMS
PowerEdge 2950
Xeon E5410 *2/2GB
Financial System
PowerEdge 2950
Xeon E5410 *2/2GB
NMS
PowerEdge 2950
Xeon E5410 *2/2GB
Mail system
PowerEdge 2950
Xeon E5410 *2/2GB
Safety Assessment System
PowerEdge 2850
Xeon 2.8G *2/2GB
Human Resource System
PowerEdge 2850
Xeon 2.8G *2/2GB
Task Management System
PowerEdge 2650
Xeon 2.8G *2/2GB
Inventory Management System
PowerEdge 1750
Xeon 2.4G *2/1GB
Identity Authentication System
PowerEdge 750
P4 2.8G/1GB
Table: XXX client data center server
 
 
 
 
 
 
 
在存储阵列方面,XXX客户数据中心的主要存储设备及其相应系统的容量与使用率情况如下所示。
 
阵列名称
使用系统
可用空间
已用空间
使用率
IBM DS4700
网管系统
1400G
800G
57%
 
邮件系统
1950G
900G
67%
 
人力资源系统
400G
400G
100%
IBM FastT600
库存管理系统
1340G
1340G
100%
 
身份认证系统
340G
170G
50%
IBM DS5020
视频服务器
1540G
1530G
97%
 